West Palm Beach 48" CIPP Pressure Pipe Rehabilitation
Lanzo Trenchless Technologies completed a project near Roebuck Road and Military Trail for the City of West Palm Beach.
The work required both lining and construction crews to complete a challenging scope with minimum disruption during
renewal of this failing PCCP sewage transmission line threatening major City, County and State Road right of ways.
CIPP Lining for NSF Trenchless Technology Repair - Collins Canal
Lanzo Trenchless Technologies responsiveness and expertise was key to this successful outcome. Lanzo accessed, bypassed
and lined the 20-inch cast iron pipe with an NSF 61 Certified CIPP liner when the City of Miami Beach was faced with a
cracked water main beneath a canal adjacent to Dade Boulevard, a major highway connection to the barrier island. Lanzo's
CIPP lining solution was an extremely cost effective and time-saving procedure (the lining timeline was less than thirty
days including chlorination and pressure testing), and it restored the structural integrity of the affected water main
without significant disruption of traffic, and other buried utilities.
Neighborhood Improvement Project
New Sanitary Collection System & Infrastructure Repair - Marimar, FL
This Sanitary Collection System and Infrastructure Repair Project required regular communications with community leaders, attention to complex timing of traffic patterns,
preparations for noise and environmental sensitivities, and extreme care for the safety of the community residents during all phases of the construction work.
Wastewater Management
Vacuum Sewage & Stormwater Collection System
Lanzo Construction's construction excellence awarded them 2013 Project of the Year from the AWPA for the installation of a new AirVac Vacuum
sewage collection system, an onsite stormwater collection system and custom curb work to control surface water and pavement restoration on
the existing roads along the 13 mile stretch of the Florida Keys.
Marine & Subaqueous Construction
Treated Effluent Pipeline Project - Virginia Key, FL
An extraordinary project where the construction of a critical ocean outfall project was designed to meet the most stringent
environmental concerns in an area of endangered sea grass and turtle nestings.
Infrastructure Renewal
UV Cured-in-Place Pipe Sewer Repair
The City of Dover, DE chose Lanzo Trenchless Technologies to install nearly 5000 feet of UV-cured CIPP to the trunk
transmission and collection sewers under a 12-block stretch of one of the city's main arteries.
Infrastructure Renewal
HDPE Sliplining Rehabilitation
Emergency rehabilitation of a critical 72" diameter force main required the sliplining of more than 8,500 linear feet
of PCCP with an HDPE liner and still represents the largest singular use of HDPE sliplining technology in the world.
Water & Wastewater Treatment
Sequencing Batch Reactor Wastewater Treatment Plant - Marathon, FL
The 0.250 MGD Sequencing Batch Reactor (SBR) wastewater treatment plant was constructed in the Florida Keys - specifically, Marathon,
FL, and designed to work in conjunction with the vacuum collection system the city had recently installed for the island.
Infrastructure Renewal
Non-Styrenated CIPP at a Casino
A Styrene-free resin CIPP technology became the solution of choice for the careful repair and rehab of the Greektown
Casino in Detroit, MI. The job had to be performed without interfering with gaming and hotel operations.
Water & Wastewater Treatment
Water & Wastewater Treatment Plant - Virginia Key, FL
This Coral Springs, FL project included the demolition and clean up of two wastewater treatment plants followed
by the construction of a new 7.4 MGD membrane water treatment plant and a 2.4 MGD package wastewater treatment plant.
Water & Wastewater Treatment
Large Diameter PCCP Yard Piping
Lanzo Construction's expertise in installing complex and large diameter PCCP was called upon to connect four new clarifiers
at the Black Point Wastewater Treatment Plant in Miami, FL. In addition, Lanzo rehabilitated existing feed pipe with a CIPP
liner, removed irrigation lines, relocated duct banks and water meters, installed tremie concrete under the clarifiers and
met very aggressive project deadlines.
Pumping Facilities
Storm Water Pump Station
Lanzo Construction installed six catch basins, two large poured-in-place storm water pump structures with pumps and
all controls, and two Vortex filtration structure systems to address a critical storm water flooding issue in a
densely populated area of Key West, FL.
Carbon Fiber Rehabilitation
54" PCCP Water Main
Lanzo Trenchless Technologies used a carbon fiber mesh and specialized application process to rehabilitate three
54" PCCP water main pipes in a dense, residential neighborhood in Miami, FL.
Carbon Fiber Rehabilitation
48" PCCP Water Main
Miami Dade Water and Sewer Department hired Lanzo Trenchless Technologies to conduct the carbon fiber rehabilitation
work on four 48" PCCP. The access manholes were located on a major roadway with distances from the manhole to
the repair opening 60 to 800 feet away. Due to the project location, it was necessary to work with multiple
crews on a 24-hour-a-day basis until the project was complete.
CIPP Infrastructure Renewal
Multiple CIPP Outfall Rehabilitation
The City of Detroit awarded Lanzo Trenchless Technologies a multiple outfall project that included fourteen large
bore outfalls. Lanzo structurally rehabilitated nearly 20,000 linear feet of concrete, brick, box culvert, and tile
sewers using either over-the-hole or conventional ASTM F 1216 direct inversion methodologies. One of the outfalls
(Joseph Campeau) was, at the time of this project, the largest singular utilization of cured-in-place pipe (CIPP)
technology in the world.
CIPP Large Bore Rehabilitation
Structural Repair of 108" Levee Equalization Culvert
The Army Corps of Engineers contracted with Lanzo Trenchless Technologies for the structural renovation of a twin barrel 108"
levee equalization culvert system located on the Northwest shore of Lake Okeechobee near the Brighton Seminole Indian Reservation.
Utilizing a barge at the mouth of each culvert, Lanzo Trenchless Technologies successfully installed two CIPP liners into the
remote pipelines. Each liner weighed over 40,000 pounds. The location and sheer size of this large bore CIPP installation
called for extreme safety precaution to protect the structural rehabilitation team, the environment, and the Seminole
community whose lands abut this critical irrigation lifeline.
Civil Engineering & Site Preparation
Wastewater Treatment Plant Upgrade (High Level Disinfection)
Lanzo Construction's civil construction team was contracted by the Miami Dade Water & Sewer Department to prepare the area
to upgrade the Black Point Wastewater Treatment Plant. Attention to detail, specification adherence and well-executed project
scheduling was critical in making the deadlines for the ultimate construction of a 285 MGD upgrade. Lanzo Construction also
installed support pile testing for the clarifiers and the new transfer pump station.
Civil Construction
Environmental Rescue & Emergency Repair - Hollywood, FL
Lanzo Construction's civil construction team was contracted by the Miami Dade Water & Sewer Department to prepare the area
to upgrade the Black Point Wastewater Treatment Plant. Attention to detail, specification adherence and well-executed project
scheduling was critical in making the deadlines for the ultimate construction of a 285 MGD upgrade. Lanzo Construction also
installed support pile testing for the clarifiers and the new transfer pump station.